Fort Lupton Middle School
Fort Lupton, Colorado

Client
Weld County School District RE-8
301 Reynolds Street,
Fort Lupton, Colorado 80621
Contact: Our primary contact, Floyd Acre, no longer works there. Please contact Anita Salazar at (303) 857-7200.

Architect
Muchow and Partners
1725 Blake Street, Denver, Colorado 80202
Contact: Paul Hutton (303) 861-1600 with Hutton Architecture Studio

Project Information
Use: Middle School
Type: Classroom Addition and Remodel
Size: 10,000 SF, Three-Story Addition With an Additional 10,000 SF of Interior Remodel (80% new and 20% remodel)
Original Contract Amount: $740,000
Final Contract Amount: $820,000
Project Duration: April 1989 to August 1989

Project Address
Fort Lupton Middle School
201 South McKinley Avenue
Fort Lupton, Colorado 80621

Description
This project had an extremely tight schedule. In order for us to complete this addition before the end of the summer term, we were required to start a month before school recessed and expeditiously, yet quietly, construct the building shell without disrupting the adjacent classroom and library. The scope of the project included: concrete foundations and a three-story structural steel framed addition. The facade was composed of steel studs with a brick veneer and over 100 double hung wood windows. The interior included: drywall partitions, structural glazed tile, acoustical ceilings, and floor and wall coverings. The mechanical system included: hot water heating, sheet metal, air conditioning and ventilation systems, and fire sprinkler systems retrofitted into the existing building.